PREMIER Design + Build Group has completed construction of a Class A industrial development located at 15010 Don Julian Rd., City of Industry, for Rexford Industrial. The project totals 219,242 square feet, including an 11,000-square-foot, two-story office component, and reflects Rexford’s and PREMIER’s continued success in delivering industrial facilities throughout Southern California.
15010 Don Julian Rd. features a 36-foot clear height, 21 dock doors, and one grade-level load-in door, supporting efficient warehouse and distribution operations, according to PREMIER. The building is equipped with an ESFR sprinkler system and a rooftop solar panel system, reinforcing a focus on safety, sustainability, and long-term operational efficiency.
The office space was designed in collaboration with a local architect to deliver a modern, highly functional interior environment. The project showcases a second-story balcony and a façade defined by expansive window lines.
PREMIER worked in collaboration with Herdman Architecture + Design, Inc., Hunter Environmental, Kramer Engineering, Huitt-Zollars, and RPM Engineers.